Skip to content

For renovators and home builders

Extras priced, signed and billed.

The homeowner signs on their phone, your crew clocks in on theirs, and each job shows its margin as receipts come in.

7 days free, no card to start. Then $39 to $179 a month for the whole company.

The Extras card on a job in CrewLog: EX-1, Move door, site instruction SI-12, 25 hours approved, added by Dana Reyes, now on change order CO-004, signed at an 18% margin, $1,000.00; EX-2, Patch wall, SI-14, 14 hours approved and 4 waiting, added by Billy Ferreira, not priced yet, $1,560.00, with Price it.

Her phone, 3:05 PM

The price band of a change order, signed: change to the contract price, approved by Helene Gagnon, plus $1,897.50, HST extra, added at invoicing.
A carpenter’s hands holding a phone over a stack of lumber at sunset, with work gloves and a tape measure beside it and the frame of a house behind.

Everything the homeowner needs comes to their phone.

Each one is a link. Nothing to install and no account to make.

  • The quote

    They tick the upgrades they want and accept with their name. Mark it won and the job opens from it.

  • Each change order

    Signed with a finger or a typed name, in the language you sent it in.

  • Each invoice

    The deposit, a progress bill or the last one. They see what they owe, never what it cost you.

  • The day’s report

    What got done and what’s next, from a link that opens with no login.

Change orders are on Crew and Pro. Read how to price an extra.

Keep the homeowner posted in plain words.

CrewLog drafts the update from the crew’s logs:
what’s done, what’s on hold and what’s waiting on them.

Read it, change what you like, send it.

The AI owner update is on Pro.

A job’s health card in CrewLog: behind schedule, about 11 days late with 2 phases overdue, and an owner update CrewLog drafted from the logs, ready to edit and send to Helene: Unit 3’s electrical rough-in and bathroom plumbing are done, and Units 1 and 2 passed their inspections. Insulation is on hold until the change order for the new outlets and pot lights is signed. Three change orders are waiting on the client’s signature, about $14,705 in all.
A job’s health card in CrewLog: behind schedule, about 11 days late with 2 phases overdue, and an owner update CrewLog drafted from the logs, ready to edit and send to Helene: Unit 3’s electrical rough-in and bathroom plumbing are done, and Units 1 and 2 passed their inspections. Insulation is on hold until the change order for the new outlets and pot lights is signed. Three change orders are waiting on the client’s signature, about $14,705 in all.

Know who’s on the job right now.

Your crew taps in on their phones, with today’s job already picked. You see who’s on, where, and since when.

The time clock is on Crew and Pro.

The crew, 6:48 AM

The live crew board’s list of who is working now in CrewLog: Billy Ferreira on Birchwood Triplex Renovation since 6:48 AM, 24 minutes; Ben Mancini on Birchwood since 6:51 AM, 21 minutes; Kwame Osei on Hillcrest Whole-Home Reno + Addition since 6:57 AM, 15 minutes; Luc Lalonde on Hillcrest since 7:03 AM, 9 minutes; Troy Whitaker on Cedar Hollow Net-Zero Custom Home since 7:07 AM, 5 minutes.

The crew, 6:48 AM

A crew member on the live board in CrewLog: Billy Ferreira, on Birchwood Triplex Renovation, clocked in at 6:48 AM, 24 minutes today and 8.9 hours this week, last updated 2 minutes ago, accurate to about 9 m, on site.

See the margin while there’s still time to fix it.

Hours land at wage plus burden and receipts are read off a photo, so a job going over shows it early.

Job costing is on Crew and Pro.

A job’s Money card in CrewLog: contract value $331,000, cost to date $331,272, over budget by $272 and a projected margin of minus 4%. At 96% complete and this rate of spend, the job finishes around $345,075, leaving minus $14,075.
A job’s Money card in CrewLog: contract value $331,000, cost to date $331,272, over budget by $272 and a projected margin of minus 4%. At 96% complete and this rate of spend, the job finishes around $345,075, leaving minus $14,075.
A job’s Money card in CrewLog: contract value $331,000, cost to date $331,272, over budget by $272 and a projected margin of minus 4%. At 96% complete and this rate of spend, the job finishes around $345,075, leaving minus $14,075.

Pick the plan your company fits.

A flat monthly price for the whole company, never per person.

Crew

Up to five people

$89a month, in USD

For you and your crew.

  • Change orders and extras, signed on the homeowner’s phone
  • The time clock and timesheets
  • Job costing and receipt scanning
  • Ten active jobs at once

Pro

No set limit on people

$179a month, in USD

For a bigger company running many jobs at once.

  • Everything on Crew
  • The AI owner update for the homeowner
  • Your logo on your reports
  • Cost codes on hours

On your own? Solo is $39 a month for quotes, invoices and daily reports.
Change orders start on Crew.

Compare every plan

Questions

Anything else? Ask us at support@crewlog.ai.

Price the next extra in CrewLog.

7 days free on Pro · No card to start · Nothing to cancel