Construction timesheets that payroll can trust

Clock in on site, fix missed punches the same week, approve before payroll runs, and put every hour on the job it was worked on.

Money7 min readUpdated

Payroll is only as good as the hours that go into it. A week written up from memory on Friday is a week of guesses: the 7:30 start that was really 7:45, the hour on the wrong job.

Good timesheets come from a few habits: hours recorded as they happen, problems fixed the same week, and someone who checks the week before it’s paid.

Record hours on site, as they happen

The most accurate timesheet is filled in as the day goes, by the person working, not written up for the whole crew on Friday.

  • Clock in and out at the job. The start, the end and the job, recorded when they happen.
  • Switch jobs when you move. A morning at one site and an afternoon at another is two jobs, not one day.
  • Agree on when the day starts: at the shop, at the site, or when the truck leaves. Write the rule down so everyone counts it the same way.
  • Add a note when something’s unusual: a late finish for a pour, a short day for rain.

Travel and shop time start most arguments. Whether they’re paid depends on the rules where you work and on your agreements, so settle it in writing and record it the same way every time.

Worked example: one day, two jobs
Birchwood, 7:00 to 11:004.0 h
Main Street, 11:00 to 3:304.5 h
Less the unpaid lunch at Main Street−0.5 h
Hours worked that day8.0 h

Four hours to each job. Written up on Friday as a day at Birchwood, Main Street’s labour cost comes up four hours short.

Get breaks and overtime right

Clock out for an unpaid meal break and back in after it. If short rest breaks are paid where you work, the crew stays on the clock for them.

Overtime is usually counted by the week: hours past the weekly line are paid at a higher rate, often one and a half times the regular rate.

Some places also count it by the day, and some trades and agreements set their own lines. Set your rule once, for everyone, and check each week against it before you pay.

Worked example: a 47-hour week, overtime after 44
Regular: 44 hours at $32.00$1,408.00
Overtime: 3 hours at $48.00, time and a half$144.00
Pay for the week, before deductions$1,552.00

At straight time the same 47 hours come to $1,504.00. The $48.00 difference is what a missing overtime rule takes from the worker that week.

Check the rules on breaks and overtime

In Ontario, the Employment Standards Act’s general rule is overtime after 44 hours a week at one and a half times the regular rate, but some construction work and many agreements have rules of their own. Breaks and overtime differ elsewhere. Check what applies to your crew.

Fix missed punches the same week

Someone will forget to clock out. What matters is that it’s fixed while people still remember the day, and that the fix leaves a trail.

  1. The worker says so as soon as they notice: which day, and what really happened. “Forgot to clock out, left site at 4:30.”
  2. Someone checks it against the daily log, the crew they were with or the time the truck got back.
  3. The fix is made by whoever approves their time, not by the worker, with a note saying why.
  4. The original stays on record. A correction that writes over the old time with no trace is one payroll can’t defend.

A missed punch, fixed from the worker’s own note. Billy said he left at 3:30, so his shift now ends at 3:30 PM and the note is closed.

Watch for shifts left running overnight. Close them, and treat the end time as a guess until the worker confirms it.

If the same person misses a punch every week, talk to them. A timesheet that’s mostly corrections has stopped being a record.

Approve the week before payroll runs

Before payroll runs, someone who knows the work approves each person’s week: usually the foreman or super they work for, with the office as the last check.

Look at these first:

  • Shifts still running, or closed with an end time nobody confirmed.
  • Two shifts that overlap, usually a missed switch between jobs.
  • Very long days, and weeks past the overtime line.
  • Hours on a day they were off, like approved vacation. Approving those pays the day twice.
  • Hours with no job on them.
  • More hours than the foreman they rode in with, on the same job.

Then approve it, or send it back with a note that says exactly what to fix: “Friday should be 6 hours, not 8.” An approved week is locked. Changing it means reopening it.

Set a deadline for approvals, like Monday at noon, and keep it, so payroll never waits on one foreman.

Code every hour, then hand payroll a clean file

Payroll needs the hours by person. Job costing needs the same hours by job and, if you use them, by cost code: framing, drywall, concrete forming.

The only time to get that right is when the hours are recorded. On Friday, nobody remembers which part of Tuesday went where.

  • Keep the code list short. A list the crew can pick from in one tap gets used. A long one gets guessed.
  • Match the codes to your estimate, so the hours on each code can be held against the hours you priced.
  • Check the codes when you approve. A week of hours on the wrong code makes a job cost report that’s wrong.

Then give payroll a file it can import: each person’s hours by day, regular and overtime, which weeks were approved and when, and the job and code if your payroll takes them.

Retyping hours is where a 7 becomes a 1. And the same approved hours feed your job costing, at the wage plus its burden.

Keep the records as long as the law asks

How long you must keep payroll and time records depends on your province, state and country. Ask your accountant, or check with your employment standards office.

How CrewLog does it

In CrewLog, the crew clocks in on their phone, with the job you booked them on already picked. Switch job puts the rest of the day on the next site, and a break is a tap to start and end.

With location on, CrewLog records where each shift started and ended, and flags anyone who clocks in away from the job. With no signal, punches wait on the phone and sync later.

Break time isn’t paid, and lunch can be set as paid, person by person.

Overtime is one rule for everyone: after a number of hours a week, at your rate, with an optional second tier and weekend rate. An Ontario account with none set is warned past 44 hours.

A worker who forgets taps Missed a punch? and says what happened. Whoever approves their time fixes the shift, and its history keeps who changed it, when, and the original times.

A shift left running is closed after the hours you set, marked as a guess, and the worker is asked when they really stopped.

Each week goes to the first person above them who approves hours. CrewLog lists what to check first, like a shift still running, two that overlap or hours on time off.

Weeks with one of those are held back from approving all at once, so each gets a look of its own.

Approving locks the week. A week can be sent back with a note saying what to fix, and an approved one can be reopened.

Cost codes are picked in one tap at clock-in, and can be changed when you review the week.

Export for payroll downloads the week as a spreadsheet file: one row per person per day and job, with its status, the day it was approved and the week’s regular and overtime hours.

Wages and pay are in the file only when someone you let see pay downloads it, and once you use cost codes, each row carries its code.

The time clock, timesheets and the payroll export are on Crew at $89 a month and Pro at $179. Cost codes are on Pro at $179 a month. Compare the plans.

More on the time clock and cost codes on the features page.

More guides

All guides

Run next week’s payroll from approved hours.

The crew clocks in on site, you approve the week, and the payroll file has every hour by person, day and job.